Case Studies

Over the last 5 years, Unique Technical Solutions have managed some wonderful projects.

 
Screenshot 2019-09-16 at 14.18.54.png

POINT A Hotel - installation

Installation of bedroom case goods and headboards at Point A Hotel, Liverpool Street (Sept 2018) and Point A Hotel, Kensington (April - June 2019).

The-Standard-916x516.jpg

Standard Hotel - installation

Unload and Installation of bedroom sofas to rooms at The Standard Hotel, Kings Cross. (July 2018 - May 2019).

9714_ro_00_p_1024x768.jpg

Ibis styles - installation

Unload and installation of bedroom case goods, beds and headboards at Ibis Styles, Heathrow (November 2018).